Row 7 begins with a full 3 tab shingle.
Shingling a shed roof peak.
Install drip caps along the rakes on top of the roofing paper.
You will know it is time to switch to.
If you have overlap that s fine.
Shingles cut into strips.
It must be completed at the very end of the shingle run to overlap the uppermost shingles and form a weatherproof.
Drive 2d 1 inch roofing nails every 10 inches.
Begin row 4 with a shingle cut in half 1 and tabs and complete that row.
How to finish the top shingle row on a shed roof step 1.
Installing roof shingles as you have just found is straight forward and if done correctly creates a durable watertight and attractive roof for your shed.
This important piece protects the roof peak from water penetration.
Start with a double layer along the eaves and work up toward the ridge the peak of the roof.
Your last course of shingles should come as close to the top as possible.
Overlap strips by about 2 inches at the edges and by 4 inches at the ends.
One you have covered both sides of the roof you will need to attach a roof ridge shingle.
For shingling a shed roof you would require thick shingles nail gun measuring tape chalks roofing paper roofing nails ladder and a razor to trim the unnecessary portion of the shingles.
Align and install the 2 tab shingle aligned with the next 5 inch higher chalk line.
Determine when to stop laying three tab shingles and switch to ridge caps.
To do this begin on one end of the ridge and place the ridge cap so that the asphalt.
Preparing the peak capping a roof is the last thing done during a roofing project.
Begin row 5 with the 1 tab shingle and row 6 with the 1 2 tab shingle.
1 galvanized roofing nails.
Below is how to install the last row of shingles on a standard shed roof.
Complete the row with 3 tab shingles.